Renovating a Springs townhouse: what it costs and what it returns

A full Springs 3E renovation runs from roughly AED 400,000 for a competent refresh to over AED 1.2m for a structural reworking. Not all of it comes back on resale. This is which parts do.

A freestanding bath against handmade grey tiles, with a black floor-standing mixer and a lit niche.

A competent Springs 3E refresh starts around AED 400,000 and a structural reworking with an extension passes AED 1.2m. Not all of it comes back on resale, and the parts that do are not the parts people expect.

Three tiers, not one word

“Renovation” in Emirates Living means one of three quite different projects, and mixing them up is how budgets double. Decide which tier you are doing before you appoint anyone.

The tier decides everything after it. It sets the approvals you need, whether you can live in the house, whether a main contractor or a fit-out firm is the right appointment, and how long the money is out. Owners who start without deciding usually finish a tier higher than they planned and a quarter later.

Tier one: cosmetic refresh

Paint, flooring, light fittings, wardrobe fronts, a garden tidy. Four to six weeks. It does not add value so much as remove the reasons a buyer discounts, which on a tired house is worth more than it sounds.

It is the right choice more often than owners expect. If the layout works, the glazing is sound and the kitchen is serviceable, a refresh removes the objections a buyer would otherwise price in. It is also the only tier that can be done between two tenancies rather than around a family.

Tier two: kitchen, bathrooms, flooring and glazing

The tier most owners actually want. Glazing is the item people skip and the one that changes how the house feels, because the original units are twenty years old and they are the reason the living room is hot at four in the afternoon.

Sequence the whole job around the glazing. The units are ordered early and delivered late, and the plaster, the paint and the flooring all wait on them. Ask for the lead time in writing at quotation stage, rather than at the point where three trades are standing in the house.

Tier three: structural

Opening the ground floor, rebuilding the stair, extending at the rear. Three to six months, main-contractor money, and the tier that turns a Springs 3E into a different house.

This is the tier that needs a designer before it needs a builder. Opening a ground floor changes the structure, the air-conditioning layout and the drainage, and each of those is a separate approval. Design fees and a survey look like an overhead until they save one wall from being rebuilt twice.

Community approvals

Emirates Living is managed, and structural work, extensions and anything touching the elevation need approval before it starts. Retrospective approval is possible and it is not a plan.

Submit early and expect a review. The pack usually wants drawings, the contractor's trade licence and insurance, and a deposit against damage to the common areas. Working hours are set by the community and they are shorter than a contractor's programme assumes, which is a cost nobody prices at quotation.

The extension rules

The setback from the boundary is what catches people out, and it is checked. Design to it from the first sketch rather than value-engineering the last metre out later.

Ask two questions of the drawing. Does it hold the setback at every point, and does it change the elevation the community sees? A rear extension that keeps the roofline is a far shorter conversation than one that does not, and the difference is usually measured in weeks of approval.

Contractor selection and the payment schedule

Stage payments tied to inspected work, a retention held to the end, and a written variation process. The cheapest quote in this market is almost always the one with the least detail in it.

Compare scope before you compare price. Ask each contractor to quote the same written scope, with provisional sums named as provisional, and require every variation to be priced before it is built. A retention held until the snagging list is cleared is the only real leverage you keep at the end.

What buyers pay more for

Light, layout and a kitchen that works. What they notice less than owners expect: expensive sanitaryware, feature lighting and anything that will date. Spend on the fabric, not on the fashion.

Think about what a buyer can see in ten minutes. Light, the route through the ground floor, the condition of the glazing, and a kitchen that reads as used rather than tired. Anything that reads as one owner's taste is a discount waiting to be argued, however much it cost to install.

A cost breakdown

On a 2,100 sq ft Springs 3E, a tier-two project typically runs to a mid-six-figure sum in dirhams once glazing is included. We give sellers a line-by-line estimate before they commit, because the honest answer is sometimes not to.

The estimate is built the same way every time. Measure the areas, price the fabric, price the glazing as its own line, then add the approval costs, a contingency and the cost of living elsewhere while the work runs. Two of those five lines are the ones owners leave out.

When not to renovate

If you are selling within six months, if the plot rather than the house is the asset, or if the community is already carrying two identical renovated houses on the market. In all three, sell as it stands and price it honestly.

There is a fourth case and it is the common one. If the budget reaches half a tier, the house ends up part-renovated, which reads worse to a buyer than a consistently original one. Do a whole tier or do a refresh. Stopping in the middle is the only outcome that loses money twice.

Where this leads next

Frank valuation
Dean Martin David in a navy suit and tie against a white wall.

Dean Martin David

Associate broker

Associate broker, and after Michael the team member most visible on our live listings.

More from Dean

02 / The guest list

Read the next onebefore it is public.

One article a month, the listings before they are advertised, and an invitation when we are running an evening at the showroom.